Lots achieved today, although it turned into a bit of a marathon. Thanks to all our helpers on very short notice.
Images
Ready for framing
Ready to begin workshop preparation and framing.
Foundations complete!
The slab is done!
A real driveway
We have a real driveway! No more bumping and/or sliding along in the dust/mud. Thanks to Tim for all things earthmoving related. We’ll now leave him alone so that he can finish building his house!
Foundation trenching done
Foundation trenching done and packing sand in place. Plus we have the makings of a proper driveway.
Footings marked out
Now that the pond has evaporated and the ground firmed up a bit, we have a level site again, marked out ready for footing trenches 🙂
Between downpours
A little wet under foot after almost an inch of rain! Under slab plumbing done and dusted. Now for some sun to dry up all the rain and we can get on with preparations for the slab.
Under slab sewerage
Plumbing well underway in between rainy days yesterday. This is the under slab sewerage connection, including separate piping for later installation of a greywater system.
Site set out done
Hurdles and string lines up. Dimensions all match. Site set out done!
Site cut underway
Day 1 on site! The cut is well underway.
You must be logged in to post a comment.