Some days building a house turns into gardening and waste management. Getting the site ready for completing the driveway and remaining earthworks was the catalyst today. The black plastic pictured is our worst waste product from the build. Exacerbated by the fact some of it is now super brittle due to sun exposure.
Author: admin
Rendering complete
External lime render is all done. The final finish is a rough hand trowel with
an oxide in the mix for colour giving a textured look. Quite different to the look inside the house.
Curved internal render finish
Managing construction waste
A beautiful autumn day for sorting through site waste. It isn’t going to get our house finished any sooner, but it is helping manage the impact of our build. So far the only surplus materials to leave the site have been straw for use in mulch and some pine off cuts (untreated) for kindling. The big pile of lime bags you see will find a home in a hugelkultur garden bed in the back yard.
First day of workshop preparation
Lots achieved today, although it turned into a bit of a marathon. Thanks to all our helpers on very short notice.
Ready for framing
Ready to begin workshop preparation and framing.
Foundations complete!
The slab is done!
A real driveway
We have a real driveway! No more bumping and/or sliding along in the dust/mud. Thanks to Tim for all things earthmoving related. We’ll now leave him alone so that he can finish building his house!
Foundation trenching done
Foundation trenching done and packing sand in place. Plus we have the makings of a proper driveway.
Footings marked out
Now that the pond has evaporated and the ground firmed up a bit, we have a level site again, marked out ready for footing trenches 🙂